|
Apr 19, 2024
|
|
|
|
CHEE 6338 - Well Construction IICr. 3. (3-0) Prerequisite: Prerequisites: Corequisite: Recommended concurrent enrollment: PWE 6340or PETR 6387 and PWE 6356. Theory, methods and practices for well casing installation, cementing operations, directional drilling and well surveying.
Add to Portfolio (opens a new window)
|
|