|
Apr 02, 2023
|
|
|
|
CHEE 6344 - Completion Operations IICr. 3. (3-0) Prerequisite: PWE 6342 or PETR 6372 . Corequisite: Recommended concurrent: PWE 6355, PWE 6346 or Instructor Approval. Engineering design and requirements of pumping fluids into the wellbore at high pressure, including fracturing, gas/water shut-off treatments, and sand control.
Add to Portfolio (opens a new window)
|
|