|
Apr 20, 2024
|
|
|
|
CHEE 6348 - Well Intervention IICr. 3. (3-0) Prerequisite: WE 6346 or Instructor Approval. Corequisite: Recommended concurrent: PWE 6349, PWE 6357. Engineering design of equipment and operations and engineering computations required for operations performed using wire lines, electric lines and coiled tubing systems.
Add to Portfolio (opens a new window)
|
|